PROVIDE CUSTOM EDITING

PROVIDE CUSTOM EDITING

English
East King  >  AI - Page Sitemap  >  custom stainless steel tube series for construction
custom stainless steel tube series for construction

custom stainless steel tube series for construction
  • custom stainless steel tube series for construction
  • SEAMLESS TUBE 1   301s.jpg
  • 310s 管.jpg
  • 310S SSPIPE.jpg

custom stainless steel tube series for construction

Compared to other products in the market, this product is competitive in various aspects of performance, practicality, durability, and service life. Its color can maintain vivid over time
Inquire Online
Get the latest price
Quantity Needed:
Pieces
E-mail:
stainless steel tube description
The product has been proven to be good in various quality parameters by our experienced quality control team. It has good dimensional stability after molding
custom stainless steel tube series for construction-1
custom stainless steel tube series for construction-2
stainless steel tube SPECIFICATIONS
Name310S Stainless Steel Tube/pipe
GradeASTM310S;SUS310S;TP310S
StandardASTM/DIN/GB/JIS/AISI
SurfaceNo.1/2B/BA/NO.4/6K/8K/HL(Hairline)/Matting
Payment TermT/T;L/C;Western Union;Paypal
Delivery Time7-15 days upon receipt of the deposit
PackageStandard Export Packing or As Customers Requirement
The product can be coated with a layer of different colors. Its color can maintain vivid over time. It has good dimensional stability after molding.
Suggested Videos
The production of East King duplex stainless steel tube meets environmental standards. For example, the paints and solvents used as surface coatings are dealt with properly in accordance with environmental regulations.
East King duplex stainless steel tube has to go through a series of production stages. They include mechanical materials preparation, metal structure design, structure fabrication, and quality tests.
East King duplex stainless steel tube goes through strict quality analysis in its manufacture. Its properties such as the fiber quality, water repellency, caking resistance and moisture permeability are tested.
East King duplex stainless steel tube has to go through the following manufacturing steps: CAD design, project approval, materials selection, cutting, parts machining, drying, grinding, painting, varnishing, and assembly.
The manufacture of East King stainless steel tube covers a wide range of stages. They include rapid prototypes, circuit board fabrication, welding, performance testing, and assembly.
The product has been recognized with ISO 9001 certification.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...